Concrete Lifting • Resin Injection • Slab Jacking

Residential • Industrial • Civil • Mining

Industrial Void Filling
With Polyurethane Resin

High Speed Structural Strength Void Filling

1

Bulding Site Piles

Fill Behind Piling Errors

Accidental unplumb piles cause washout of surrounding earth during rain.. 

Use structural grade polyurethane resin to fill behind piles and stop subsidence and growing voids.

Neglect or Oversight

2

Fill Earth Cavities

It is hard to keep track of everything on industrial sites, especially when you aren’t activly searching for it. 

Over time, water can wash out earth below slabs, tanks, walls and footings. .

3

Sea Walls

Wave and Tide Erosion

USea walls are designed to stop the erosion of the earth so we can safely build along shores.

Often seawalls have gaps which allow tides and waves to wash out the soil. Inject it with resin and it will be stable.

Construction Errors

4

Sometimes Errors Occur During Construction.

OSD Tanks can float out of excavated holes before they are finished, causing voids to develop below.

Improper site drainage can cause major washouts after big storms or rain events. Resin injection will stop any delays.

Now Enter Your Details Below

Name(Required)
Are your contact details correct?

Don’t Forget!

Next time you encounter an unexpected void, you’ll know that  our polyurethane resin foam is your go-to solution. 

It’s efficient, effective, and, most importantly, gets you back on solid ground quickly.

Click below to call us now.